The SLAM Method: Shock Level and Maintain (Pool Algae Cure)
SLAM = Shock Level And Maintain. Raise free chlorine to shock level — about 40% of your CYA — then hold it there, testing and topping up 2–3 times a day, until three things are true: the water is clear, overnight FC loss is 1 ppm or less, and CC is 0.5 ppm or less. Think days, not hours. And use liquid chlorine — it’s the cleanest shock for this job.
SLAM is the method behind most of those "my green pool is finally blue" forum success stories. It’s not a product — it’s a discipline: the right chlorine level, held relentlessly, until the water proves it’s done. Every part of it is simple except the patience.

Pool chemical dose calculator
Estimate from standard pool-industry dosing ratios. Add two-thirds, retest after circulation, then top up. Never mix chlorine products together. Your product label has the final say.
Before you start
Test and write down your CYA — shock level is 40% of it. Get pH to 7.2–7.5 first (pH tests read falsely high above 10 ppm FC, so set it now while you still can). Clean the filter. Brush every surface — algae hides in a biofilm that chlorine penetrates slowly, and brushing exposes it. And stock enough liquid chlorine for several days, because running out mid-SLAM is how people quit.
If CYA is over 90, do yourself a favor and partially drain first — the shock level gets impractical above that.
The process
Dose liquid chlorine up to shock level (the shock calculator does the math). Test FC 2–3 times a day; every time it’s dropped, add chlorine back up to shock level. Brush daily. Run the pump 24/7. Backwash or clean the filter when the pressure rises.
You’ll watch the water go green → teal → cloudy blue → clear. That cloudiness near the end is dead algae your filter is hauling out — keep the filter clean and let it work.

How you know you are done (all three)
1) The water is clear — you can see the deep-end drain distinctly. 2) Overnight chlorine loss is 1 ppm or less (test after sundown, test before sunrise, no additions in between). 3) Combined chlorine is 0.5 ppm or less. All three — no partial credit. Two out of three means keep going, because quitting early is exactly how pools go green again a week later.
Then let FC drift back down to normal range and go back to maintenance. And don’t swim at shock level — the pool can wait.
- Shock level ≈ 40% of CYA (ppm FC).
- Test + top up 2–3x daily. Pump 24/7. Brush daily.
- Done when: clear water + overnight loss ≤1 ppm + CC ≤0.5.
- Use liquid chlorine — no calcium/CYA baggage across many doses.