Pool Maintenance Schedule: Daily, Weekly, Monthly Checklist
Daily: check FC and dose every evening. Weekly: pH plus a fuller test, skim, empty the baskets. Monthly: the complete panel — TA, CH, CYA, and salt if you have it — plus a look at the equipment. Prevention is a 10-minute daily habit, not a weekend project.
Almost every pool disaster — green water, etched plaster, a dead salt cell — is a maintenance-schedule failure wearing a chemistry costume. The routine below is boring. That’s the point. Boring pools are good pools.

Daily (5–10 minutes)
Test FC and dose to target every evening with liquid chlorine. Glance at pH every couple of days. Skim the surface. That daily chlorine rhythm is the single highest-leverage habit in pool ownership — everything else is downstream of it.
Weekly (20–30 minutes)
Run the basic full test: FC, CC, pH, TA. Adjust whatever’s out of range. Brush the walls — yes, weekly. It prevents the biofilm that chlorine struggles to penetrate. Empty the skimmer and pump baskets. Check filter pressure and backwash or clean when it’s 8–10 psi above clean pressure. Net out the debris.

Monthly (45 minutes)
Complete panel: everything weekly, plus calcium hardness, CYA, and salt (if saltwater). Inspect the salt cell for scale. Walk the equipment pad — look for leaks, listen for odd pump noises, check the O-rings. And test CYA especially if you use tablets or dichlor, because it creeps up on you.

Seasonal
Opening: full panel, deep clean, filter service, and fresh reagents for the test kit (old reagents lie). Mid-season: reassess CYA and salt after heavy rain stretches. Closing, if you’re in a cold climate: balance the water, lower it per your cover type, and winterize the plumbing per the manufacturer’s guidance.
- Daily: FC check + evening dose (~10 min).
- Weekly: FC/CC/pH/TA, brush, baskets, filter pressure.
- Monthly: CH, CYA, salt + equipment inspection.
- Brush weekly — biofilm prevention beats algae cure.
